Client: Downer and NZTA
Period: 2020 to 2022
S&L Scope:
- S&L provided professional surveying services in relation to the roading corridor improvements, along State Highway 30, Te Ngae Road, between Sala Street and IIes Road in Rotorua. Working alongside WSP and NZTA, and closely with the main contractor Downer, this was delivered, despite a period of unprecedented interruptions, due to the Covid 19 outbreak and lockdowns
- Establish Survey Controls - Relocated and Re-establish 11 LINZ survey marks
- LINZ survey plan prepared and lodged
- Legalization Surveying – including management of LINZ
- Construction Surveying – Levels, Set-out, Maintain Survey Controls and Benchmarks. Onsite throughout duration of project